SouthlakeBath Free Estimate

Bath remodeling in Southlake

Shower and Tub Remodeling in Southlake, TX

This is the project people take on when the rest of the room is still fine. The vanity and the toilet stay put, and one wet corner comes out and goes back in. Almost everything deciding whether that corner still looks right in fifteen years sits under the tile, which is why this page leans on waterproofing rather than on tile color.

Head-on view of a beige stone-tiled shower with a frameless glass door, a chrome rain head and handset, a lit recessed niche holding four toiletry bottles, and a linear drain set into the floor

The work behind a shower or tub replacement

What decides the price of this one

Replacing a shower or a tub is frequently the entire job, and it stays that way as long as the rest of the room is sound.The overview of every scope shows where that stops being true. Nearest to this page sits full renovation, which opens up considerably more of the room. Both routes begin at our Southlake bathroom remodeling work.

Shower and tub questions

What drives the price of a new shower?

Mostly the parts nobody sees. A site-built pan, a complete membrane system and a new valve cost hours that reusing what is already in the wall never spends. Tile format moves the labor, and glass is priced by panel and by hardware. No figure appears on this page, because any figure would be a guess about your bathroom. Tell us which of those you want and we will set them out as separate line items rather than as one number.

Is a curbless shower possible in any bathroom?

Not automatically. The floor has to give up some height, either by recessing the framing between joists or by building the rest of the bathroom floor up to meet the pan. A slab house and a wood floor over a crawl space raise different problems, and so does a joist that runs the wrong way beneath the drain. Ask us to look at it standing in the room. Where the structure will not allow it, a very shallow threshold gets most of the same benefit.

How long is the bathroom out of use for a shower replacement?

As a planning range for this kind of scope rather than a commitment, a like-for-like replacement on the existing footprint is often talked about as one to two weeks of site time, with a curbless conversion and a moved drain running longer. Mortar and membrane need curing time that cannot be hurried, and glass is not measured until tile is finished, so the door tends to arrive behind the rest.

Can a bathtub go back in where a shower is now?

Yes, and it is asked for more often than people expect. The work is the conversion running backwards: the drain returns to a tub position, valve and spout heights change, and the floor has to carry the tub full of water with a person in it. That last point matters most with a freestanding tub on a wood floor. Ask for the filled weight of the model you like and have the floor looked at before it is ordered.

Get quotes for this project

No cost, and no obligation. Tell us about the room and we will come back to you with a written quote.